Punjab Irrigation, Drainage and Rivers Act, 2023 › IRRIGATION AND RECLAMATION SCHEMES

Section 20 Punjab Irrigation, Drainage and Rivers Act, 2023 — Preparation of provisional schemes

(1) Where he considers it expedient to do so, the Secretary may:

(a) cause an irrigation scheme to be prepared to apply any conveniently available water to a canal in the most advantageous and economic manner; and

(b) cause a reclamation scheme to be prepared to construct a drain to reclaim an area in the most advantageous and economic manner.

(2) In so far as practicable, every provisional irrigation and reclamation scheme shall, among other things describe in general terms:

(a) the lands which could conveniently and economically be irrigated or, as the case may be, reclaimed by it;

(b) the source of obtaining water therefor and volume of such water;

(c) the works that are necessary for receiving, collecting, storing, conserving and distributing the water or reclamation of the lands referred to at serial (a);

(d) an estimate of capital cost as well as annual cost of maintaining the proposed works; and

(e) an estimate of annual revenue which is likely to be derived from it.

(3) Nothing contained in this section and sections 21, 22 and 23, shall apply to a scheme for renewal, repair or extension of an existing canal or an existing drain, or their associated canals or tributaries, or enhancement of their capacity.