Punjab Irrigation, Drainage and Rivers Act, 2023
Section 69 Punjab Irrigation, Drainage and Rivers Act, 2023 — Certain certifications by construction engineer required
(1) No listed dam, embankment or other irrigation work shall be constructed unless a qualified civil engineer is employed to design it and supervise its construction.
(2) As soon as the said engineer considers that the construction of a listed dam has reached a stage at which it can properly be filled wholly or partly with water, he shall give a certificate specifying the level up to which, and manner and conditions in which it may be so filled safely.
(3) A listed dam shall not be filled with water, otherwise than in accordance with the said certificate.
(4) As soon as the construction of a listed dam, embankment and irrigation work is completed, the said engineer shall submit a certificate to the unit that it has
been efficiently executed in accordance with drawings and description annexed to the certificate, and shall annex to the certificate detailed drawings and description giving full information of the works actually constructed, including dimensions and levels and details of the geological strata or deposits encountered in trial holes or excavations made in connection with the works.