Punjab Irrigation, Drainage and Rivers Act, 2023 › RIVERS, EMBANKMENT WORKS AND FLOOD CONTROL
Section 83 Punjab Irrigation, Drainage and Rivers Act, 2023 — Execution of public embankment works
(1) Whenever it appears to the Chief Engineer that:
(a) a new public embankment shall be executed;
(b) the line of an existing public embankment shall be altered or lengthened;
(c) a sluice may be made through a public embankment;
(d) an embankment which connects a public embankment or is formed by junction with the part of a line of public embankment shall be taken under the charge of the Government; and
(e) an embankment or obstruction of any kind, which endangers the stability of a public embankment or safety of a town or village, or which is likely to cause loss of property by interfering with the general or flood drainage of any tract of land shall be removed or altered;
he may cause a provisional scheme to be prepared along with a map showing lands likely to be affected and benefited by it, and shall cause a notice specifying that any objections may be made to him by a day falling no earlier than fifteen days from the date of the notice.
(2) Any interested person may, by the fixed date, submit his objection to the Chief Engineer, giving facts and reasons he relies upon therefor, on any of the following grounds:
(a) that the said scheme is unnecessary or impracticable for any reason; or
(b) it is likely to be uneconomical.
(3) Where no objection is received by the fixed date, or the objections so received are, in view of the Chief Engineer, insufficient or invalid, he may approve the said scheme with or without any modifications and:
(a) where so required submit it to the Secretary for arranging sums to carry out the scheme or to permit him to take over an embankment referred to at clause (d) above;
(b) allow the sluice to be made through a public embankment; or
(c) require the owner of the embankment or the person causing the obstruction referred to at clause (e) above, to remove or suitably alter it, and if he ignores or refuses to do so, cause it to be removed or altered at his expense, and all sums incurred shall be due by him to the Chief Engineer and if he does not, when called upon, make full payment, such expenses shall be recovered from him as an arrear of land revenue.
(4) Where it appears to the Divisional Canal Officer that immediate doing or execution of any act or work mentioned in subsection (1) is necessary to prevent or control a sudden and extensive public injury, he may, with the permission of the Chief Engineer, do such act or execute such work immediately and the provisions of this section relating to notice, invitation of objections shall not apply.