Section 88 Punjab Irrigation, Drainage and Rivers Act, 2023 — Alignment etc. of an embankment to be fixed after study
Unless, in the view of the Chief Engineer, it shall be immediately executed to prevent or control a sudden and extensive public injury, the alignment, geometry, layout, height and other specifications of an embankment and river training work shall be fixed only after carrying out and giving due consideration to the results of:
(a) topographical surveys and analysis of local soil and geological conditions; and
(b) a simulation, by an appropriate mean such as physical or numerical modeling, of the river conditions which are likely to affect its safety and efficient operation, and the impact it is likely to have on the flood plain and prevailing river conditions after its execution.