Punjab Irrigation, Drainage and Rivers Act, 2023 › RIVERS, EMBANKMENT WORKS AND FLOOD CONTROL

Section 92 Punjab Irrigation, Drainage and Rivers Act, 2023 — Flood protection plans

(1) Every year, sufficiently before the onset of monsoon, every Divisional Canal Officer shall:

(a) carry out an objective assessment of likely sources and probability of riverine flooding in the area under his charge and the risks and damages associated with such an event; and

(b) based on such assessment, prepare a plan to prevent such risks, and apprehend and avert any public injury.

(2) The said plan shall be consistent with the strategy referred to at section 91 and, among other things, include:

(a) a mention of any dam, headwork, weir, sluice, or other irrigation work, or reach of an embankment, canal or drain which is weak or otherwise vulnerable and a schedule for its surveillance, strengthening and protection;

(b) the number and description of officers, other staff and labourers as well as earth moving machines, instruments, stores and other materials which will be required for effectively responding to various levels and types of flood events;

(c) a description of areas, persons and properties that are likely to be affected at various levels and types of flood events and procedures and measures to be followed for their protection;

(d) a plan for forecasting flood events and procedures for warning and evacuation of population from affected areas;

(e) relevant inundation maps at an appropriate scale;

(f) the role and duties of various authorities in this respect and a system to effect coordination among them for collaborative action; and

(g) a mention of specific event or point in time when the plan or any measure under it shall be put into implementation.

(3) A similar plan shall be prepared by every Superintending Canal Officer and Chief Engineer in respect of the areas under their charge, and by the Secretary in respect of the Punjab.

‹ Section 91 — Flood risk management strategy | Section 93 — Duty towards collaborative effort for flood protection ›